Hydropower Construction Project Electric Power Transmission Line
Hydropower Construction Project Electric Power Transmission Line :
- Customer Name:
China Three Gorges Project Corporation
- Project Name:
The Three Gorges Dam Project Third Phase Power Transmission Line Construction
- Goal:
The project will install 32 water-turbine generator sets, each with 700,000 kW capacity on both sides of the Three Gorges Dam, as well as 2 power stations of 50,000 kW capacity. The total installed gross capacity of 22.5 million kW is top of the world and has greatly alleviated the regional power shortage of the State Grid.
- Product Contents:
35 kV- power cable
220 kV ACSR
power cable accessories - Construction Duration:
10 months